17th floor, The Shard, 32 London Bridge st, London SE2 9SG

London, United Kingdom

In November 2014. Damvent delivered a hybrid air-handling unit of its last generation - max.e3 to the highest building in Europe - the skyscraper The Shard, located in the center of London.

Gallery See Gallery
Torus-white Created with Sketch.

Used products

  • 1 x max.e3-06

    Total treated airflow - 6 000 m3/h

In November 2014. Damvent delivered a hybrid air-handling unit of its last generation - max.e3 to the highest building in Europe - the skyscraper The Shard, located in the center of London.

Our solutions of the highest energy class have been trusted by the management Warwik Business School - one of the leading business schools in Europe. Founded in 1967, Warwik Business School currently attracts 6500 students from 125 different countries - http://www.wbs.ac.uk/

Their new training base provides brand new lecture halls of the new generation, workshop rooms and IT laboratory, and is located on the 17th floor of a 87 storey skyscraper, which is 306 meters high and is located in the center of London Bridge Quarter – a district, located in one of the busiest areas of London, and just minutes from the city center.

The supplied and installed by Damvent facility is series max.e3-06 (Vnom. = 6000m3 / h) and services the training lecture halls of WBS.

The decision, which has been selected by the designer is extremely innovative - VAV (Variable Air Volume - Variable air flow) control of the system. Unlike most standard solutions used with constant air flow and variable temperature, with VAV the decisions rely on variable air flow at a constant supply temperature. The advantages of VAV systems are characterized by precise control of the temperature of the supply air to the room, increasing the useful life of the compressor, a low power consumption of the fan and compressor and lower noise levels.

In different stages of choosing a supplier, Damvent overcame the competition of many local and world-renowned manufacturers, as it took us over 6 months forwinning the project.

We are proud to announce that Damvent justifies the enormous trust,votedto us by the side of the investor and the main contractor on HVAC part.