2nd Floor, Ferguson House, St Helier Hospital, Wrythe Lane

2nd Floor, Ferguson House, St Helier Hospital, Wrythe Lane

Carshalton, Surrey, SM5 1AA, United Kingdom

Damvent delivered and assempled on site two pieces Hybrid Hygienic Air Handling Unit - max.e2-H-09 at Epsom and St Helier University Hospitals.

Gallery See Gallery
Torus-white Created with Sketch.

Used products

  • 2 x max.e2-H-09

    Total treated airflow - 14 500 m3/h

Damvent delivered and assempled on site two pieces Hybrid Hygienic Air Handling Unit - max.e2-H-09 at Epsom and St Helier University Hospitals. As the building is existing and there is no way to put the entire units on the roof, a team of specialits of Damvent had to assembled them on site.

Total heating power of the Air Handling Unit –150 kW.
Total cooling power of the Air Handling Unit – 90 kW.